8th January 2014

Northamptonshire Highways have informed the Parish Council that they are proposing to carry out repair work to the bridge crossing the river nene on the county boundary at Duck Street, Elton.

Temporary traffic signals will be in place throughout the works period and the carriageway width over the bridge will be reduced to 3 metres.  Pedestrian access will however, be maintained over the bridge.

The works are programmed to start in mid to late March and are scheduled to last for six weeks.

Wendy Gray, Parish Clerk